Technical review
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
Architects, interior designers, renovation firms and operators can involve us at the point where design information needs to become buildable furniture.
Send us the available documentation, location, units and target date
The scope can begin with a defined design or with a still open need. We confirm what documentation exists and what decisions are missing before manufacturing
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
We adjust construction solutions, thicknesses, machining and hardware to the intended use
Manufacturing according to documentation and finishes validated before starting
We plan delivery, access, fitting, adjustments and review of installed parts
The dialogue, level of detail and planning change depending on who coordinates the work and how the furniture must be delivered.
We turn the design intent into a solution that can be measured, manufactured and installed to the agreed detail
We integrate the custom carpentry into the renovation schedule and review the conditions before fitting
We organize typologies, units and phases to be able to value the furniture with a comparable and documented scope
We assess furniture projects for rooms and common areas based on frequent use, cleaning and maintenance.
We study commercial furniture that combines display, storage, brand image and real conditions of the premises
We propose solutions for homes intended for sale or rent according to the typology, use and planned investment.
Tell us who coordinates the work, what furniture you need and what documentation exists. We will review the case by scope, not by label
Each milestone reduces uncertainty and leaves a record of what is manufactured, how it is finished and under what conditions it is installed.
Plans, measurements, units, finishes, location and planned schedule
Technical queries, exclusions, alternatives and outstanding information
Final measurements, samples, hardware, details and fitting conditions
Manufacture, control, delivery, installation and agreed adjustments
It is not necessary for all documentation to be closed. We review what is available and point out exactly what information is missing to continue
What parts should be manufactured and if there are repeated typologies
Plan, elevations, details or approximate dimensions for a first review
Prescribed finishes or visual references to propose a viable equivalence
town or area, access routes, phase of work and target installation date
The final scope is confirmed after reviewing the documentation and actual project conditions
Yes. We review the documentation, detect manufacturing doubts and confirm details, materials, fittings, measurement and fitting before assessing the final scope
Yes, as long as it is defined what part of the development we assume. We can propose constructive solutions and materials compatible with the use and the planned investment.
Yes. We need to know typologies, quantities, location, delivery sequence, storage and installation conditions
Measurements, configuration, materials, finishes, fittings, relevant junctions, economic scope and transport and installation conditions
Some projects arrive with plans and a finish schedule; others begin with phone photographs. Both can progress well when the assumptions are made visible early.
A sketch is welcome, but it is not compulsory. Current drawings, finish intent, programme dates and known access constraints usually reveal enough to separate the immediate need from ideas that can wait.
If several people use the room, we record the disagreement as well as the shared priorities. It is better to resolve that tension in the layout than during fitting.
An early width and height can rule out the wrong approach without pretending to be a workshop survey. Once the layout is credible, we verify the walls, levels and fixed elements that affect manufacture.
We distinguish a dimension used to explore an idea from one released to the workshop. That small discipline prevents an early estimate from quietly becoming a production instruction.
A convincing sample is one that still makes sense beside the floor, doors and light that will remain. We also confirm what supports it, how edges are finished and which hardware carries the load.
We may recommend spending more on runners or hinges and less on a fashionable outer surface. The choice depends on which part carries the daily work.
For an address in Dénia, we confirm how protected parts will move from the vehicle to their final position. This can change carcass divisions while leaving the visible composition calm.
We also confirm where packaging and offcuts can be handled. It is a small logistical question with a noticeable effect on a tidy fitting day.
We separate essentials from optional details and state what the quotation includes. If a premium finish absorbs money without improving the brief, we will say so.
The most expensive version is not automatically the most convincing. Proportion, alignment and a calm distribution often do more for the room than another decorative feature.
You will not be asked to approve everything at once. Layout comes before minor details; verified dimensions come before production; fitting arrangements are settled before delivery.
Clients should leave each stage knowing what they need to decide and what remains with us. Silence is not treated as approval.
Share plans, units, location and target date. We will tell you the next step